[email protected] +86-21-58386189, 58386176

How to Calculate Cement, Sand and Aggregate required for 1 ...

The proportions of cement, sand, coarse aggregate and water plays an important role in determining the fresh and hardended properties of concrete. So care should be taken while calculating the amount of Cement, Sand and Aggregate required for 1 Cubic meter of Concrete. Method-1: DLBD method to determine material requirement for 1 Cum concrete The DLBD (Dry Loose …

On-Site concrete calculator. - Source4me

On-Site Concrete calculator. Use this calculator to determine how much sand, aggregate (gravel) and cement is required for mixing on site a given area of concrete (1:2:4 ratio). Please enter the dimensions in the white fields below and click calculate to display the results. See below for help on concrete.

Metric calculator for concrete - cement, sand, gravel etc

Both of these concrete calculators make an allowance for the fact that material losses volume after being mixed to make concrete. Calculator are provided for a general mix and a paving mix, the different ratio of materials are: General mix - 1:5 cement:all-in ballast or 1:2½:3½ cement:sharp sand:gravel. and

Post Hole Concrete Calculator - Inch Calculator

Using the table below, you would need to buy at least eight 80 lb. bags and one 40 lb. bag (yielding a total of 5.1 cubic feet) of concrete to allow enough for extra. Pre-Mix Bag Concrete Yield The following table shows the approximate yield of mixed concrete for common bag weights.

Concrete Calculator - Estimate Cement, Sand, Gravel ...

Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

Method of findingthe dry ingredient quantity of 1 m3 concrete.

3) i.e. the total amount cement needed = volume of dry materials * 1/7. 5. Calculate the number of bags of concrete by dividing the required volume of cement by the unit volume per bag of cement (0.0332 m3 per 50 kg bag of cement or 1 ft3 per 94 lb bag). For example, for a 2 m x 2 m x 10 cm thick pump pad: 1. Required volume of concrete = 0.40 ...

quantity of gravel required per 1 m3 of concrete

The formula for calculation of materials for required volume of concrete is given by: ... Thus, the quantity of cement required for 1 cubic meter of concrete = 0.98/0.1345 ... QUANTITIES OF MATERIALS PER CUBIC METRE OF CONCRETE. Read More

Estimation of Cement, Sand, and Gravel in Construction

In the estimation of cement, sand, and gravel volumes for concrete proportioning, we use the Fuller's Formula. ... G = volume of gravel per cubic meter of concrete work (m 3 of gravel / m 3) c,s,g = cement-sand-gravel ratio (relative amounts of solids by volume in a mixture) ... mukhang merong mali. volume of concrete is 2000 pero you will need ...

Quantities of Materials Per Cubic Meter of Concrete Mix ...

for 15MPa, as per Indian code, its mix ratio is 1:2:4, and for this mix, it is shown in the above table that, cement required is 310kg of cement or 6.2 number of bags of cement, 0.434 cubic meter of sand (FA) and 0.868 cubic meter of coarse aggregate or stone.

How To Calculate Cement, Sand, & Aggregate Quantity In 1 ...

Aug 03, 2018· Consider volume of concrete = 1m3. Dry Volume of Concrete = 1 x 1.54 = 1.54 m3 (For Dry Volume Multiply By 1.54) Now we start calculation for find Cement, Sand and Aggregate quality in 1 cubic meter concrete. CALCULATION FOR CEMENT QUANTITY; Cement= (1/5.5) x 1.54 = 0.28 m 3 ∴ 1 is a part of cement, 5.5 is sum of ratio

Calculate Quantities of Materials for Concrete -Cement ...

We have considered an entrained air of 2%. Thus the actual volume of concrete for 1 cubic meter of compacted concrete construction will be = 1 -0.02 = 0.98 m 3. Thus, the quantity of cement required for 1 cubic meter of concrete = 0.98/0.1345 = 7.29 bags of cement. The quantities of materials for 1 m3 of concrete production can be calculated as ...

How to Calculate Quantities of Cement, Sand and Aggregate ...

The ratio of dry volume to the wet volume of concrete is 1.54. So 1.54 Cum of dry materials (cement, sand and aggregate) is required to produce 1 Cum of concrete. Volume of Cement required = 1/(1+2+4) X 1.54 = 1/7 X 1.54 = 0.22 Cum. Volume of Sand required = 2/7 X 1…

Concrete Calculator

Related Volume Calculator. Concrete is a material comprised of a number of coarse aggregates (particulate materials such as sand, gravel, crushed stone, and slag) bonded with cement. Cement is a substance that is used to bind materials, such as aggregate, by adhering to said materials, then hardening over time.

Concrete Calculators - cement, sand, gravel and all-in ...

Both concrete calculators make an allowance for the fact that ballast etc losses volume when mixed to make concrete. Two Concrete Calculator are provided for different concrete mixes: General mix - 1:5 cement:all-in ballast or 1:2½:3½ cement:sharp sand:gravel. and ; Paving mix - 1:3½ cement:all-in ballast or 1:1½:2½ cement:sharp sand:gravel.

Gravel Calculator – Square Footage Area

Answer = 10 x 10 x 1 = 100 ft 3. Please note that all measurements should be in same units. Finally to calculate the weight of gravel required, multiply the volume with the density of the material. Let's assume that the density of the material is 47.5723 kg/ft3. Weight of gravel required should be 47.5723 x 100 = 4757.23 kg

How Much Cement, Gravel And Sand Do I Need? | GoodHome IDS

How Much Gravel do I Need – Concrete is a mixture of sand, gravel, cement, and water. When wet, it can be formed in different ways. When it hardens or sets, it becomes like rock. It is used to bond bricks or stones, or to make walls, walkways, and sidewalks.

Gravel Calculator

- 1 cubic yard = 3105.0985915 lbs - 1 cubic meter = 4048.789445 lbs. 4. Estimation of the total number of bags required by dividing the total gravel mass required to bags units. Metric - bags: - for bags of 50 kg each it divides the number of tons to 0.05. - for bags of 80 kg each it divides the number of tons to 0.08. - for bags of 100 kg each ...

Gravel Calculator - Stone Warehouse

As rubber chippings have a different density than gravel, please use the following table to calculate quantities required: 1 bag = 0.25m 2 approx. 1 bag = 0.12m 2 approx. 4 bags = 1m 2 approx. 8 bags = 1m 2 approx. 1 Bulk Bag (850kg) = 10m 2 approx. 1 Bulk Bag (850kg) = 5m 2 approx.

Calculate Sand & Gravel per 50kg Cement Bag in Volume & Weight

Volume of sand needed = 1.25 x 2 = 2.5 CFT. Volume of Gravel needed = 1.25 x 4 = 5 CFT. Therefore to prepare M15 Grade concrete, use 2.5 cubic feet of sand and 5 cubic of gravel per bag of cement. Volume of sand and gravel needed per bag of cement for different concrete grades

Gravel Calculator - Easily Calculate How Much Gravel You Need

Calculating an accurate estimate of how much gravel or aggregate you need for a driveway is simple with our gravel calculator. All you need to know is the desired length and width of the driveway, along with what gravel depth you need. You can get an estimate right now using the calculator above. ... If you are ordering a large amount of gravel ...

Calculate Cement Sand & Aggregate - M20, M15, M10, M5 ...

Calculate the concrete quantity required in cubic meter and then multiply the quantity with the cement sand and aggregate for 1 cubic meter of concrete. In your case Volume of concrete = 1.7 x 1.7 x 0.5 = 1.4 cu.m It looks like you are using m20 grade mix with extra sand. If you follow that mix proportion then to calculate use this following ...

Concrete Mix Design | Different Grades of Concrete

May 17, 2017· 8 bags of cement required for 1 cu.m of M20 grade concrete. 672 kg of Sand required for 1 cu.m of M20 grade concrete. 1326 kg of 20mm Aggregate is required for 1 cu.m of M20 grade concrete. 200 litres of water is required for 1 cu.m of M20 grade concrete. Table for Quantity of Cement, Sand, Aggregate, Water required for Different grades of ...

Gravel Calculator | How much gravel do you need? - Omni

You can calculate the required volume of gravel by multiplying the gravel path area by the desired thickness: 23 yd² * 0.1 yd = 2.3 yd³ The last things to assess are the estimated weight of the required gravel and its cost.