[email protected] +86-21-58386189, 58386176

Gravel Calculator | How much gravel do you need? - Omni

Step one is establishing the volume of gravel needed. It is equal to the volume of an excavation, and you can do it in the following way: Determine the length and width of a cuboidal excavation. In our example the excavation length is l = 6 yd and the width is b = 3 yd. Calculate the area of the excavation, multiplying the length and width ...

quantity of rock crushed per hour by a crusher

Crusher Loading Feeder 40 - FMC Technologies around the entire crushing chamber. ... signals from the crusher to increase or decrease the volume of material fed to the crusher.The Operator not only gets greater tons/hour of processed rock, but also gets a ...Rock that is crushed with a consistent ... of net finished product will return an additional $900 per hour in rock.

How much does excavation cost? | 2019 cost guide | Service ...

To determine a basic cost of excavation for foundation, most professionals will charge per yard of dirt which usually equates to $100. Based off quotes posted on Service.com.au, you can expect to pay between $200 to $1000 for the excavation of a property. Excavation rates can be greatly affected by several factors : Size of block

How to Calculate Excavator Bucket Capacity | Hunker

Jul 17, 2017· If management requires 800 tons to be moved per hour, and the machine and operator average 120 cycles per hour, then 800 / 120 = 6.67 tons moved per cycle. Step 4 Divide the per cycle payload (6.67 tons) by the material density (1.25 tons/cu. yd.) to determine the nominal bucket capacity: 6.67 / 1.25 = 5.28 cu yds.

Estimating Excavation Revised - Craftsman Book Company

rates. Examples are most rock excavation, nearly all hand excavation, and backhoe work around sewer lines, underground utilities, or existing structures. Naturally, prices for special quantities are higher than prices for general quantities. Keeping these two quantities separate protects you. Most excavation …

Calculation of the volume of the trench - zhitov.ru

Calculation of the trenches or ditches Specify dimensions in metres L - the total length of trenches or ditches A - width at the top of the B - bottom width H - the depth of the trench The program calculates the volume and surface area of the trench. If the width of the top and bottom of the trench will be different then calculated Additionally useful volume C and volume of sloped sections D.

hoe ramming rock excavation price per cubic meter ...

Construction & Contractors: Rock Excavating, rock excavation, rock … A large hoe-ram will often cost … contract that rock excavation would be charged at $1500 per day … hoe-ram will not, usually, have an hour-meter but … rock excavation cost blasting versus hydraulic hammer per cubic …

How to calculate productivity of construction equipment ...

How to calculate productivity of construction equipment like excavator, dozer, rock breaker, riper.. Answer / vinod k I think 75% efficiency is correct as excavation of soil itself takes time & depends upon the area where excavation is to be done, if the excavation area is mix of soil & rocks then efficiency will be less & No. of cycles/hr will ...

CHAPTER 4 - EXCAVATION AND EARTHWORK

quantity paid in excavation (solid rock cut). No further reduction for wastage is permissible. The finished item should be matched with the above quantity. For Example:- Hard rock-cut (solid volume) from excavation. 1.00 cum Corresponding stack volume with 40% voids. 1.67 cum. Quantity of utilisable rock (for rubble, pitching stones

Excavation Costs & Prices - ProMatcher Cost Report

$2,000.00 to $2,400.00 per day for excavator (8 hours) $1,500.00 to $1,700.00 per day for trencher (8 hours) We are a construction company that enter into contracts that have a payment schedule for owners contractors to follow per agreement by both parties Reported by: Brian Minix, Minix Excavation& demolition See the Concord Excavation Cost Report

201 ROADWAY EXCAVATION (CLASS 1, CLASS 1-A, CLASS 2) - …

201.03.04 Rock Excavation (a) Boulders and Rock. Boulders and rock from the excavation may be broken and used in embankment if the materials conform to 204.02.01. (b) Blasting. Refer to TC-6.07. Where rock encountered in cuts requires drilling and blasting, finished slopes shall remain reasonably straight and clean.

6 Measurement and Earthwork Calculations

begins and after excavation is completed. The volumes are computed by the average end area method. Excavation may also be measured on a lump sum basis. When this occurs, no individual measurements are required. There are many other special cases for different types of measurements and classes of excavation which may be encountered on a construction

SCHEDULE OF RATES

BHEL Schedule of Rates BHEL ITEM NO DESCRIPTION UNIT Contractors Rate( Rs) Remarks 1 Earth work in surface excavation not exceeding 30cm in depth but exceedign 1.5 m in width as well as 10sqm on plan including disposal of excavation earth upto 50m and lift upto 1.5m, disposal soil to be levelled and neatly dressed: 1.1 All kinds of soil sqm 2073.60

how much cu.m of earth can excavated by machine per day

Jul 10, 2011· Sun Jul 10, 2011: Post #1: prasadtvp Join date: Dec 2009: It depends upon the soil type and machine category. For ordinary gravelly soils with JCB ( around 40HP) will excavate around 30-40 Cum per Hour and in sandy soils it is about 35-45 CUm .

Hydrovac Excavation is expensive! - LinkedIn

Sep 03, 2014· per hour and removes two yards of soil in that hour, their actual cost is $150 per yard. If Company B only charges a "bargain" $200 per hour but moves only a yard of soil in that

Excavation calculator: cost and volume | JustCalc.com

Excavation cost (per 1 m3) Soil removal cost (per 1 m3 ) This is the free online excavation calculator, intended to define and estimate the planned volume of the earthwork of the construction pit carried out for the foundation of a house or another building, French drain of a villa, trench needed to establish the sewage system of a house ...

Rate Analysis of Excavation in Earthwork -Calculate ...

That means, a hydraulic excavator can excavate 242.4242 m 3 of soil in one day. Its cost per day including driver and fuel is Rs. 5000. Then the cost of 10m 3 of excavation can be calculated as: No. of days required for 10m 3 excavation = 10/242.4242 = 0.04125 days. The cost of hydraulic excavator for 10m 3 excavation = 0.04125×5000 = Rs.206.25

Hand Excavation Productivity - Excavation & Site Work ...

Dec 07, 2011· Hand Excavation Productivity ... I think you'll find hydro-vaccing to be more reliable in this scenario due to the large volumes that need to be moved. I don't think you'll get 7cy per man per day. You should be able to get 10-12cy per day from each truck, …

EXAMPLE CALCULATIONS OF POSSIBLE GROUND-WATER …

cubic foot per day (ftVd) 0.02832 cubic meter per day cubic foot per second (ft^/s) 0.02832 cubic meter per second mile 1.609 kilometer square foot 0.09290 square meter III. EXAMPLE CALCULATIONS OF POSSIBLE GROUND-WATER INFLOW TO MINE PITS AT THE WEST DECKER, EAST DECKER,

Excavation Cost Estimating Example

Title: Excavation Cost Estimating Example Author: Photios G. Ioannou Subject: CEE 431 Construction Contracting Created Date: 10/28/1999 10:32:08 PM

2020 How Much Does Excavation Cost? | 2020 Cost guide ...

There may also be a separate charge for attachments, such as $100/day for a rock grab, $180/day for an auger $500/day for a diamond blade rock saw. The size and complexity of your job will determine the final cost. Excavation is often necessary if you are landscaping, installing a pool, building on a sloping block or renovating your home. Your ...

How Much Does Excavation Cost? - Service Seeking

Besides excavation, the preparation work includes firming the crushed rock with sand, which costs $30 to $40 per square metre. According to that, the total price for the mentioned prep work on a standard driveway (18m2) will be between $540 and $720 plus the cost of the crushed rock and sand.

2020 Excavation Costs | Price to Grade or Level a Yard ...

A typical residential excavation job runs between $1,439 and $5,039 with an average of $3,083.Though most companies charge anywhere from $40 to $150 an hour, residential jobs receive project bids.Project bids reflect cubic yards of dirt moved, anywhere from $50 to $200 per cubic yard.Land excavators are subcontractors who rarely oversee entire jobs - though you can hire one directly for things ...

2020 Average Excavations Cost (with Price Factors) - Thumbtack

New 1,000-square-foot lawn: $1,750, or $1.75 per square foot . Topsoil excavation—scraping off two inches of existing topsoil or lawn to level area and hauling away debris . 50 cents per square foot to clear the 1,000-square-foot lawn: $500; 8 yards of new topsoil at $30 per yard: $240. Labor and materials for installation of new sod: $1,010